Ho System, Actually Build the software. Develop the judgment.

ho 0.5

definition
depth 3/3 − deeper + surface

The decimal slot for an unplanned step slipped in before the next major one.

The conventional decimal slot for an inserted ho between the overview and the first planned major: "a step that wasn't in the original plan and logically precedes the next major."

Special Positions. Zero (00): The orientation ho. Every project arc starts here. Ho 00 is the project's first working session—it establishes pre-conditions, primes the concepts the build needs, fixes the project's ho-shape conventions, and hands off to the first building ho. The sequence plan itself—the phase assignments and dependency graph—lives in the Ho Overview, the Kamae 4 document ([[kamae-project-framing|Kamae: Project Framing]] (framework/structure/kamae-project-framing.md) §2.4), not in ho-00. (Earlier framework versions equated ho-00 with the Ho Overview; that usage is superseded—the overview is Kamae 4, and ho-00 is the orientation-shaped first ho. Live instances: this repo's ho-00-orientation.md, plus sharibako and sageframe-mcp. Merge-decisions D7, bidirectional supersession.)

Point-five (0.5): The conventional position for an inserted ho between two planned majors. Ho 0.5 (Tool Mastery) sits between ho-00 (orientation) and the first real work (01). It's reserved for "we need a step here that wasn't in the original plan, and it logically precedes the next major."

The .0 and .00 positions within a branch are never used. Ho 05.0 doesn't exist—it would be Ho 05. Ho 05.70 doesn't exist—it would be Ho 05.7. The number extends only when new work branches off.